newsroom 6.1 polish on PR #286: slog default logger + Grace's re-review nits #291

Closed
opened 2026-10-15 19:27:03 +00:00 by paperclip · 0 comments
Contributor

Fix item 1 from Grace Hopper's re-review of PR #286 (ICB-163, PASS at 5979c3d): make the configured logger the slog default. Also fix her nits (except the health copy, which is already tracked in newsroom-cleanup). Same branch paperclip/ICB-159-app-wiring, same PR #286. Keep using /openspec-apply-change. Do not merge. Grace does a short re-check afterwards.

NO SYMLINKS: never leave bazel-* or any other symlink in the repo/workspace; pass --experimental_convenience_symlinks=ignore to every Bazel command; find . -type l -not -path './.git/*' must print nothing before you finish.

Source: conversation ICB-138, user comment 81e4aa6d-b6f4-4552-9194-6e5ba24083b3. Full plan is in this task's plan document.


Synced from Paperclip ICB-165

Fix item 1 from Grace Hopper's re-review of PR #286 (ICB-163, PASS at `5979c3d`): make the configured logger the slog default. Also fix her nits (except the `health` copy, which is already tracked in `newsroom-cleanup`). Same branch `paperclip/ICB-159-app-wiring`, same PR #286. Keep using `/openspec-apply-change`. Do not merge. Grace does a short re-check afterwards. **NO SYMLINKS:** never leave `bazel-*` or any other symlink in the repo/workspace; pass `--experimental_convenience_symlinks=ignore` to every Bazel command; `find . -type l -not -path './.git/*'` must print nothing before you finish. Source: conversation ICB-138, user comment 81e4aa6d-b6f4-4552-9194-6e5ba24083b3. Full plan is in this task's plan document. --- _Synced from Paperclip [ICB-165](https://paperclip.home.icb4dc0.de/ICB/issues/ICB-165)_
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
prskr/tools#291
No description provided.